Part No.: 9372716014 (Compressor ASSY)
Applicable System: Fujitsu General J-Series VRF


Check Point 1: Circuit Connection

  • Verify terminal wiring between TR PCB ASSY and Compressor:

    • U (Red), V (White), W (Black) terminals.

  • Ensure each wire is firmly connected and the terminal cover is secure.


Check Point 2: Operation Check

Perform functional verification under normal compressor operation:

  1. Pressure

    • Pressure decreases when the refrigerant charge is low.

    • Pressure does not decrease if the piping is blocked.

  2. Discharge Temperature

    • Temperature increases when the refrigerant is low.

  3. Operating Current

    • Current increases under low refrigerant charge.

    • Current rises sharply if the compressor is locked (mechanical fault).


Check Point 3: Winding Resistance

Measure resistance between all terminal pairs (U–V, V–W, W–U).

Measurement PointsExpected Resistance
U–V / V–W / W–U0.187 Ω

⚠ Replace compressor if resistance is 0 Ω (short) or ∞ Ω (open circuit).


Check Point 4: Cooling Test Operation

  • Verify compressor speed during test mode:

    • 1 cycle = 3 Hz, 6-pole permanent magnet motor.

  • Speed pattern during test:

    • Hold 1: 50 rps for ~230 seconds

    • Hold 2: 70 rps for ~550 seconds

    • Gradual increase beyond hold periods as load stabilizes.

Use a clamp meter on the U (Red) phase output from the TR PCB ASSY to verify speed and current stability.


Summary Table

CheckTest PointNormal ConditionAction if Abnormal
WiringTR PCB → CompressorU, V, W secureReconnect or replace harness
PressureSuction / DischargeDrops on start-upInspect refrigerant or blockage
ResistanceU–V–W0.187 ΩReplace compressor
CurrentClamp testStable riseCheck PCB or motor if erratic